The Construction Industry's Material Crisis and What it Means For You

In case you didn’t know, or simply didn’t care last year because you weren’t planning any building work, the last year has seen a shortage of construction materials and a massive rise in prices. This posed a massive problem for builders, who found themselves trying to fulfil quotes which, three months previously, would have been reasonable, but now fail to cover a fraction of the material costs due to no fault of their own.

In case you didn’t know, or simply didn’t care last year because you weren’t planning any building work, the last year has seen a shortage of construction materials and a massive rise in prices. This posed a massive problem for builders, who found themselves trying to fulfil quotes which, three months previously, would have been reasonable, but now fail to cover a fraction of the material costs due to no fault of their own.

So, what caused the crisis?

The materials shortage arose as the result of a perfect storm of situations. This included the impact of Brexit on trade; Covid which simultaneously caused restricted supplies; a rise in demand and disrupted work; and the rise in the cost of energy, which meant that national suppliers found themselves incurring massive additional costs.

What is the impact on material costs?

According to the Department for Business, Energy and Industrial Strategy, building material costs rose every single month from September 2020-September 2021, with the price of all building work being 25% higher in October 2021 than in the previous year.

Which materials are affected?

The primary materials affected are:

  • Cement – according to BEIS, production in 2021 dropped by more than 10% in 2021 which, combined with continued demand, has placed a strain on industry.
  • Roof tiles – with lead times from 5-7 months for concrete and clay roof tiles and no sign of demand dropping.
  • Bricks and blocks – the high demand of 2021 is expected to continue into 2022, with lead times lengthening and prices continuing to rise.
  • Timber – 2021 saw a huge timber shortage which led to soaring prices, leaving many builders having to absorb the additional cost, often working for very little – or even nothing. This shortage has eased marginally, with unprecedented imports of timber, according to the Timber Trade Federation (TTF). However, congestion in both Scandinavian and UK ports could lead to further shortages and further price rises come spring.
  • Steel – the result of increased demand as well as decreased supply from China - the world’s biggest steel provider - steel was one of the first materials to be impacted by the pandemic.

What you can do

This rise in materials can be incredibly frustrating for homeowners and construction workers alike. Decide whether your project is urgent, and whether you are prepared to gamble on the fact that prices may drop in the next 6-12 months. Ask your local builder for advice; nobody is better placed to predict trends than somebody who is placing orders on a regular basis. Finally, remember to give the construction sector a break! Traders have continued to work incredibly hard amid unprecedented demand and have born the brunt of their customers’ frustrations at rising prices and adjustments to quotes. Remember that they are trying to deal with the same challenges as you – on a bigger scale!

For more tips and advice, follow us on Facebook or Twitter.

Looking for more building advice?

Find clear, practical answers to common building questions, helping homeowners understand everyday issues, know what checks they can carry out safely, and when it is best to contact a qualified professional.

  • Do I need planning permission for a home extension?

    Plenty of extensions don't need planning permission - they fall under Permitted Development. Whether yours qualifies depends on the size, location, and type of build. Single-storey rear extensions up to four metres on a detached house often get the green light, but side extensions, two-storey builds, and properties in conservation areas usually do need permission. Always check with your local planning authority before you start - building without the right approvals can mean being made to undo it all.

  • What is involved in building a conservatory?

    You're looking at groundworks and foundations, the frame and glazing, the roof, and then the internal fit-out - flooring, heating, electrics. Most conservatories under a certain size fall under Permitted Development, but they still need to comply with Building Regulations, especially if you want to use the space as a proper room year-round. On the roof: solid or tiled options make a huge difference to usability - traditional polycarbonate can be unbearably hot in summer and freezing in winter. Most projects take two to six weeks.

  • Do I need a structural engineer for my home renovation?

    Not for everything - but if structural changes are involved, yes. Removing a load-bearing wall, putting in a steel beam, touching the roof structure, or adding a sizeable extension all need a structural engineer to design the solution and produce the calculations for Building Regulations approval. A builder might tell you whether a wall is load-bearing, but only a structural engineer can specify the right beam and carry professional liability for that advice.

  • Do I need planning permission to install patio doors?

    Usually not, if you're replacing an existing door or window in the same opening - that typically falls under Permitted Development. But if you're making the opening larger or creating a new one in an external wall, you may need planning permission or Building Regulations approval. Conservation areas, listed buildings, and properties with an Article 4 Direction have tighter rules, so check before assuming. Any structural work to the opening, like fitting a new lintel, needs Building Regs sign-off regardless.

  • Does my extension need Building Regulations approval even without planning permission?

    Almost always, yes. Planning permission and Building Regulations are two separate things. Extensions need to meet regulations covering structural integrity, fire safety, insulation, ventilation, and drainage - regardless of whether you needed planning approval. Your local authority's building control team can confirm exactly what's required. And don't skip it - missing Building Regs sign-off can cause real headaches when you come to sell.

  • How long does a typical home extension take?

    A small single-storey extension usually takes eight to twelve weeks from groundworks to completion. Add several months if planning permission is needed before work can even begin. Bigger builds - two-storey additions or anything needing significant structural work - can take four to six months or more. Get a realistic timeline from your builder upfront, and factor in a buffer for the unexpected.

Have a question about TrustATrader?

If you have a question in relation to TrustATrader specifically, please check out the TrustATrader FAQs, with separate lists tailored to consumers and tradespeople. Alternatively, get in touch with our team. We're happy to help!